Cisco 4948-10GE Installation Guide - Page 39

Pre-installation Requirements, Warnings and Cautions

Page 39 highlights

Chapter 2 Site Planning Site Power Requirements • EMI Recommendations, page 2-4 • Power Requirements and Heat Dissipation, page 2-4 Pre-installation Requirements Follow these requirements when preparing your site for the switch installation: • Connect each switch to separate wiring on a dedicated circuit; provide each switch with its own branch circuit connection with sufficient overcurrent protection and direct grounding to the branch circuit. • To prevent a loss of input power, be sure the total maximum load on each AC circuit is within the current ratings of the wiring and breakers. Warnings and Cautions Follow these precautions when preparing your site for the switch installation: Caution The total maximum load on each AC-input power circuit must be within the rating of the wiring and breaker. An overload of input power can result if this requirement is not met. Warning Read the installation instructions before connecting the system to the power source. Statement 1004 Warning Installation of the equipment must comply with local and national electrical codes. Statement 1074 Warning Ultimate disposal of this product should be handled according to all national laws and regulations. Statement 1040 78-18039-02 Catalyst 4900 Series Switch Installation Guide 2-3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142

2-3
Catalyst 4900 Series Switch Installation Guide
78-18039-02
Chapter 2
Site Planning
Site Power Requirements
EMI Recommendations, page 2-4
Power Requirements and Heat Dissipation, page 2-4
Pre-installation Requirements
Follow these requirements when preparing your site for the switch installation:
Connect each switch to separate wiring on a dedicated circuit; provide each
switch with its own branch circuit connection with sufficient overcurrent
protection and direct grounding to the branch circuit.
To prevent a loss of input power, be sure the total maximum load on each AC
circuit is within the current ratings of the wiring and breakers.
Warnings and Cautions
Follow these precautions when preparing your site for the switch installation:
Caution
The total maximum load on each AC-input power circuit must be within the rating
of the wiring and breaker. An overload of input power can result if this
requirement is not met.
Warning
Read the installation instructions before connecting the system to the power
source.
Statement 1004
Warning
Installation of the equipment must comply with local and national electrical
codes.
Statement 1074
Warning
Ultimate disposal of this product should be handled according to all national
laws and regulations.
Statement 1040