D-Link DSN-3400-20 User Guide - Page 83
Viewing Scheduled Activities Schedule Tab
UPC - 790069299773
View all D-Link DSN-3400-20 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 83 highlights
4. When the message in Figure 5-4 tells you that the event history file has been saved successfully, click OK to remove the message. Figure 5-4. Event History File Save Message 5.2.2 Viewing Scheduled Activities (Schedule Tab) The Schedule tab in the System Administration View lets you view, suspend, or delete activities that you have scheduled. Each row in the tab corresponds to an activity that has been scheduled. Examples of activities that can be scheduled include volume scanning, volume reconfiguration, and downing of a drive. The tab provides Suspend, Cancel, and Delete buttons for suspending, canceling, or deleting scheduled activities. To suspend a scheduled activity, click the activity and click the Suspend button. The Suspend button toggles to Resume for this activity. To resume a suspended activity, click the activity again and click the Resume button. To delete a scheduled activity, click the scheduled activity and click the Delete button. To cancel a scheduled activity that is being performed or is suspended, click the activity and click the Cancel button. If the task is set to recur, this procedure only cancels the current operation. To cancel all future occurrences of the activity, use the Delete button to delete the scheduled task. xStack Storage Management Center Software User's Guide 73