D-Link DSS-200G-28MPP Product Manual - Page 24

Hardware Installation, Step1: Unpacking, Packing Contents, Step2: Switch Installation

Page 24 highlights

D-Link DSS-200G MP/MPP series Switch User Manual 3. Hardware Installation This chapter provides unpacking and installation information for the D-Links witch. Step1: Unpacking Open the shipping carton and carefully unpack its contents. Please consult the packing list located below to make sure all items are present and undamaged. If any item is missing or damaged, please contact your local D-Link reseller for a replacement. Packing Contents • One D-Link DSS-200G MP/MPP series switch • One AC power cord • Four rubber feet • Rackmount kit • One accessory kit for a ground screw • Quick Installation Guide Step2: Switch Installation For safe switch installation and operation, it is recommended that you: • Visually inspect the power cord to see that it is secured fully to the AC power connector. • Make sure that there is proper heat dissipation and adequate ventilation around the switch. • Do not place heavy objects on the switch. Desktop or Shelf Installation When installing the switch on a desktop or shelf, the rubber feet included with the device must be attached on the bottom at each corner of the device's base. Allow enough ventilation space between the device and the objects around it. Figure 3-1 Attach the adhesive rubber pads to the bottom Rack Installation The switch can be mounted in an EIA standard size 19-inch rack, which can be placed in a wiring closet with other equipment. 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136

D-Link DSS-200G MP/MPP series Switch User Manual
19
3.
Hardware Installation
This chapter provides unpacking and installation information for the D-Links witch.
Step1: Unpacking
Open the shipping carton and carefully unpack its contents. Please consult the packing list located
below to make sure all items are present and undamaged. If any item is missing or damaged, please
contact your local D-Link reseller for a replacement.
Packing Contents
One D-Link
DSS-200G MP/MPP series switch
One AC power cord
Four rubber feet
Rackmount kit
One accessory kit for a ground screw
Quick Installation Guide
Step2: Switch Installation
For safe switch installation and operation, it is recommended that you:
Visually inspect the power cord to see that it is secured fully to the AC power connector.
Make sure that there is proper heat dissipation and adequate ventilation around the switch.
Do not place heavy objects on the switch.
Desktop or Shelf Installation
When installing the switch on a desktop or shelf, the rubber feet included with the device must be
attached on the bottom at
each corner of the device’s base. Allow enough ventilation space between
the device and the objects around it.
Figure 3-1 Attach the adhesive rubber pads to the bottom
Rack Installation
The switch can be mounted in an EIA standard size 19-inch rack, which can be placed in a wiring
closet with other equipment.