Grounding, The cable attached to these, studs is typically red., typically black.
View all Dell Force10 C300 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
www.dell.com | support.dell.com Step Task (continued) 7 Remove the outer nuts and washers from each of the remaining studs. 8 Connect the -48 VDC and Return cables from each PEM to the remote sources. Verify that the remote source is in the OFF position. Locate the appropriate studs on the PEM front panel. • The two top studs (furthest from the GND) are the return (+48V DC) connection. The cable attached to these studs is typically red. • The two bottom studs (closest to GND) are the -48 V DC connection. The cable attached to these studs is typically black. NOTE: Cables must be terminated only with a UL-listed 2-hole lug to accommodate 1/4-inch studs with 3/4-inch spacing. Apply a coat of anti-oxidant paste to the connector studs, if required. Replace the washers and nuts on the studs. Route the terminated cables out toward the rack rail. Secure the nuts with a nut driver or torque wrench (not to exceed 4 ft/lbs). Figure 8-3. Grounding Return (+48V) Connectors Ground Connector -48V Connectors Step Task (continued) 9 Replace the safety cover and tighten the captive screw. Note that the safety cover can be rotated to accommodate system configurations. 10 Turn the Over-Current Protector to the ON position (Figure 8-1). 11 Turn the remote source (the circuit breaker panel) to the ON position. 36 | Installing DC Power Entry Modules