HP 11642 HP Rack Options Installation Guide for the 11000 G2 Series Rack and t - Page 52

Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated

Page 52 highlights

2. Place the other end of the same grounding strap over the grounding lug on the rack top. 3. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top, and then tighten the washer. From the grounding lug on the rack top to the grounding lug on the perforated panel: 1. Place one end of a 36.83-cm (14.5-inch) grounding strap over the grounding lug on the rack top. 2. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top, and then tighten the washer. 3. Place the other end of the same grounding strap over the grounding lug on the perforated panel. 4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated panel, and then tighten the washer. From the grounding lug on the perforated panel or fan kit to the grounding lug on the egress slot: 1. Place one end of a 15.24-cm (6-inch) grounding strap over the grounding lug on the perforated panel or fan kit. Ground Bonding kit 52

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97

Ground Bonding kit 52
2.
Place the other end of the same grounding strap over the grounding lug on the rack top.
3.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top,
and then tighten the washer.
From the grounding lug on the rack top to the grounding lug on the perforated panel:
1.
Place one end of a 36.83-cm (14.5-inch) grounding strap over the grounding lug on the rack top.
2.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top,
and then tighten the washer.
3.
Place the other end of the same grounding strap over the grounding lug on the perforated panel.
4.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated
panel, and then tighten the washer.
From the grounding lug on the perforated panel or fan kit to the grounding lug on the egress slot:
1.
Place one end of a 15.24-cm (6-inch) grounding strap over the grounding lug on the perforated panel
or fan kit.