HP 11642 HP Rack Options Installation Guide for the 11000 G2 Series Rack and t - Page 55

Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the top side

Page 55 highlights

5. Repeat steps 1 through 4 for the other middle side panel. From the middle system chassis rail to the top side panel: 1. Connect a 36.83-cm (14.5-inch) and a 15.24-cm (6-inch) grounding strap with connectors together. 2. Insert a T-25 Torx screw through the end of a 36.83-cm (14.5-inch) grounding strap, and then secure the screw to the middle system chassis rail. 3. Place the end of the 15.24-cm (6-inch) grounding strap over the grounding lug on the top side panel. 4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the top side panel, and then tighten the washer. 5. Repeat steps 1 through 4 for the other top side panel. Ground Bonding kit 55

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97

Ground Bonding kit 55
5.
Repeat steps 1 through 4 for the other middle side panel.
From the middle system chassis rail to the top side panel:
1.
Connect a 36.83-cm (14.5-inch) and a 15.24-cm (6-inch) grounding strap with connectors together.
2.
Insert a T-25 Torx screw through the end of a 36.83-cm (14.5-inch) grounding strap, and then secure
the screw to the middle system chassis rail.
3.
Place the end of the 15.24-cm (6-inch) grounding strap over the grounding lug on the top side panel.
4.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the top side
panel, and then tighten the washer.
5.
Repeat steps 1 through 4 for the other top side panel.