HP LH4r HP Netserver LH 3/LH 3r to LH 4/LH 4r - Page 11
Verifying Contents
View all HP LH4r manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
Chapter 1 Introduction 15. Reconfigure the system with the Setup and NetRAID utilities, using the configuration details you saved in step 2. 16. Verify that the system is restored to its operating configuration. NOTE This procedure assumes that you are not performing other procedures, such as installing new PCI cards, tape drives, or other hardware, or performing operating system upgrades, at this time. You can do these operations while performing the LH 3 to LH 4 upgrade, but minimizing changes makes troubleshooting much easier if problems or incompatibilities arise during the upgrade process. Verifying Contents The contents of the shipping box include: • A new LH 4 CPU baseboard, containing two processor terminator cards, four Voltage Regulator Modules (VRMs), and two memory boards • Two Intel Pentium II™ Xeon™ processors • Four 64 MB EDO RAM DIMMs (one set of DIMMs) • LH 4 nameplates for the pedestal and rack configurations • Two chassis reinforcement bars • A Technical Reference Card (which fits into an envelope inside the chassis) • An HP NetServer Navigator CD-ROM and an accompanying flexible disk • A Torx™ T-15 driver for loosening screws • This manual Recycling the LH 3/LH 3r CPU Baseboard Dispose of the LH 3/LH 3r CPU baseboard by shipping it to Hewlett-Packard in the provided box. 7