HP Server rp7420 Installation Guide, Fifth Edition - HP 9000 rp7420 Server - Page 57

Cabling and Power Up

Page 57 highlights

4 Cabling and Power Up After the system has been unpacked and moved into position, it must be connected to an AC power source. The AC power must be checked for the proper voltage before the system is powered up. This chapter describes these activities. Chapter 4 57

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

Chapter 4
57
4
Cabling and Power Up
After the system has been unpacked and moved into position, it must be connected to an AC power source.
The AC power must be checked for the proper voltage before the system is powered up. This chapter describes
these activities.