HP Server rp7420 Installation Guide, Fifth Edition - HP 9000 rp7420 Server - Page 60

Voltage Check

Page 60 highlights

Cabling and Power Up Voltage Check Voltage Check This section provides voltage check information for use on the customer site. The emphasis focuses on measuring the voltages at the power cord plug end specified as an IEC 320 C19 type plug. This end plugs directly into the back of the HP 9000 rp7420 Server chassis. NOTE These procedures must be performed for each power cord that will be plugged directly into the back of the HP 9000 rp7420 Server. If the expected results from this procedure are not observed during the voltage check, see the next section titled "Voltage Check (Additional Procedure)." 60 Chapter 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

Chapter 4
Cabling and Power Up
Voltage Check
60
Voltage Check
This section provides voltage check information for use on the customer site. The emphasis focuses on
measuring the voltages at the power cord plug end specified as an IEC 320 C19 type plug. This end plugs
directly into the back of the HP 9000 rp7420 Server chassis.
NOTE
These procedures must be performed for each power cord that will be plugged directly into the
back of the HP 9000 rp7420 Server. If the expected results from this procedure are not
observed during the voltage check, see the next section titled “Voltage Check (Additional
Procedure).”