HP Server rp7420 Installation Guide, Fifth Edition - HP 9000 rp7420 Server - Page 77

Using the Checklist, Table 4-2, Factory-Integrated Installation Checklist

Page 77 highlights

Cabling and Power Up Using the Checklist Using the Checklist The following checklist is an installation aid and should be used only after you have installed several systems using the detailed procedures described in the body of this manual. This checklist is a compilation of the tasks described in this manual, and is organized as follows: PROCEDURES The procedures outlined in this document in order IN-PROCESS The portion of the checklist that allows you to comment on the current status of a procedure COMPLETED The final check to ensure that a step has been completed and comments Major tasks are in bold type, sub tasks are indented. Table 4-2 Factory-Integrated Installation Checklist PROCEDURE Initials Obtain LAN information Verify site preparation Site grounding verified Power requirements verified Check inventory Inspect shipping containers for damage Unpack SPU cabinet Allow proper clearance Cut polystrap bands Remove cardboard top cap Remove corrugated wrap from the pallet Remove four bolts holding down the ramps and remove the ramps Remove antistatic bag Check for damage (exterior and interior) Position ramps Roll cabinet off ramp Unpack the peripheral cabinet (if ordered) IN-PROCESS Comments Initials COMPLETED Comments Chapter 4 77

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

Chapter 4
Cabling and Power Up
Using the Checklist
77
Using the Checklist
The following checklist is an installation aid and should be used only after you have installed several systems
using the detailed procedures described in the body of this manual. This checklist is a compilation of the tasks
described in this manual, and is organized as follows:
PROCEDURES
The procedures outlined in this document in order
IN-PROCESS
The portion of the checklist that allows you to comment on the current status of a procedure
COMPLETED
The final check to ensure that a step has been completed and comments
Major tasks are in
bold type
, sub tasks are indented.
Table 4-2
Factory-Integrated Installation Checklist
PROCEDURE
IN-PROCESS
COMPLETED
Initials
Comments
Initials
Comments
Obtain LAN information
Verify site preparation
Site grounding verified
Power requirements
verified
Check inventory
Inspect shipping containers
for damage
Unpack SPU cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
Remove corrugated wrap
from the pallet
Remove four bolts holding
down the ramps and
remove the ramps
Remove antistatic bag
Check for damage (exterior
and interior)
Position ramps
Roll cabinet off ramp
Unpack the peripheral
cabinet (if ordered)