HP StorageWorks 2/8-EL SAN Switch 2/8 V3.1.x - Installation Guide - Page 43

Assembling the inner rails with plenum

Page 43 highlights

Installing the SAN Switch 2/8 5. Assemble each of the two inner rails and plenum as follows: Note: Verify if the plenum shipped preinstalled on the switch. If the plenum shipped as a separate item, use the following steps to install the plenum and the two inner rails. If the plenum is already installed, use these steps to attach the two inner rails only. a. Place the plenum on the switch (near the rear of the switch as shown in Figure 12). b. Align the plenum with the screw holes on either side of the switch, as shown in Figure 12. c. Secure each of the two inner rails and plenum using eight #8-32 x 5/16 Phillips pan-head screws (with attached star lock washers) and eight #8 flat washers, as shown in Figure 12. . 1 4 3 2 1 Plenum 2 8-32 x 5/16 phillips pan head screws 3 Flat washers 4 Inner rails (1 of 2) Figure 12: Assembling the inner rails with plenum SHR-2561A Note: Please note that the numbered items shown in Figure 12 must be ordered separately. SAN Switch 2/8 Version 3.1.x Installation Guide 43

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114

Installing the SAN Switch 2/8
43
SAN Switch 2/8 Version 3.1.x Installation Guide
5.
Assemble each of the two inner rails and plenum as follows:
Note:
Verify if the plenum shipped preinstalled on the switch. If the plenum shipped as
a separate item, use the following steps to install the plenum and the two inner rails. If
the plenum is already installed, use these steps to attach the two inner rails only.
a.
Place the plenum on the switch (near the rear of the switch as shown in
Figure 12
).
b.
Align the plenum with the screw holes on either side of the switch, as
shown in
Figure 12
.
c.
Secure each of the two inner rails and plenum using eight #8-32 x 5/16
Phillips pan-head screws (with attached star lock washers) and eight #8
flat washers, as shown in
Figure 12
.
Figure 12:
Assembling the inner rails with plenum
Note:
Please note that the numbered items shown in
Figure 12
must be ordered
separately.
.
1
Plenum
2
8-32 x 5/16 phillips pan head screws
3
Flat washers
4
Inner rails (1 of 2)
1
2
3
4
SHR-2561A