Hitachi C12LSH Instruction Manual - Page 14
Applications, Preparation, Before, Operation
UPC - 717709010338
View all Hitachi C12LSH manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
English APPLICATIONS Wood and aluminum sash. PREPARATION BEFORE OPERATION Make the following preparations before operating the power tool: 1. Installation Base 5/16" (8mm) bolt .ao) Zo E co E Oa? co E E U) 11/32" (9 mm) FI 3 holes 9-39/64" (244 mm) 11-1/16" (281 mm) Fig. 4 Work bench 5/16" (8mm) nut Attach the power tool to a level, horizontal work bench in accordance with Fig. 4. Select 5/16" (8 mm) diameter bolts suitable in length for the thickness of the work bench. Bolt length should be at least 1-9/16" (40 mm) plus the thickness of the work bench. For example, use 2-9/16" (65 mm) or larger bolts for a 1" (25 mm) thick work bench. The holder attached to the rear of the base helps stabilize the power tool. a7c ---1/ Holder adjustment: Loosen the 6 mm bolt with the 10 mm box wrench. Adjust the holder until its bottom surface contacts the work bench surface. After adjustment, firmly tighten the 6 6 mm mm bolt Bolt Move Holder Adjust the holder until its bottom surface contacts the work bench surface. Fig. 5 14