IBM 866441Y Hardware Maintenance Manual - Page 200
Press F1 for, Configuration/Setup, Diagnostics, appear, Press F1.
UPC - 087944522201
View all IBM 866441Y manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 200 highlights
d. Using a screwdriver, tighten the screws that hold the front of the slide rails to the front of the rack. e. Slide the server into the rack enclosure again until the slide latches on the front chassis brackets click into place. 6. (Optional) For additional security, such as when transporting the rack, fasten the server to the rack enclosure by inserting a M6 by 16-mm screw through the chassis bracket, mounting rail, and cage nut on each side. 7. Connect all server and device cables and connectors. 8. Use the server configuration program to reconfigure the server. Because of the new orientation of the server, you must change the server configuration so that the Netfinity Manager program will show a graphic of a rack model for this server instead of showing a tower model. a. Press the power control button to turn on the server, and watch the display. b. When the messages Press F1 for Configuration/Setup and Press F2 for Diagnostics appear, Press F1. c. Select System Information; then select Product Data. d. Change the machine type and model from a tower model to a rack model. 1) Find the machine type and model in the Tower column in the following table. 2) Change it to the machine type and model shown in the Rack column. Tower 8664-11Y 8664-21Y 8664-31Y Rack 8664-1RY 8664-2RY 8664-3RY 192 Netfinity Server HMM