IBM QS21 User Guide - Page 33

power-control

Page 33 highlights

Once you have installed the operating system and performed any required updates, the blade server is ready for use. If you have not already done so, turn on the blade server by pressing the power-control button on the blade server control panel. The power on LED on the blade server changes from the slowly-flashing state to a continuously lit (steady) state. If you have other blade servers to install, you can do so now. Chapter 3. Installing the blade server 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110

Once
you
have
installed
the
operating
system
and
performed
any
required
updates,
the
blade
server
is
ready
for
use.
If
you
have
not
already
done
so,
turn
on
the
blade
server
by
pressing
the
power-control
button
on
the
blade
server
control
panel.
The
power
on
LED
on
the
blade
server
changes
from
the
slowly-flashing
state
to
a
continuously
lit
(steady)
state.
If
you
have
other
blade
servers
to
install,
you
can
do
so
now.
Chapter
3.
Installing
the
blade
server
17