IBM QS21 User Guide - Page 50

Finishing, installation, Installing, front, bezel, assembly

Page 50 highlights

Finishing the installation To complete the installation you must: 1. Reinstall the front bezel assembly on the blade server if removed. See "Installing the front bezel assembly" for further information. 2. Ensure there is a DIMM filler or a DIMM in each of the I/O buffer DIMM slots. 3. Replace and close the blade server cover. See "Closing the blade server cover" on page 36 for further information. Statement 21: CAUTION: Hazardous energy is present when the blade server is connected to the power source. Always replace the blade cover before installing the blade server. 4. Reinstall the blade server into the BladeCenter unit. See Chapter 3, "Installing the blade server," on page 15 for further information. 5. Turn on the blade server. See "Turning on the blade server" on page 9 for further information. 6. If you have replaced the battery or the system board assembly, reset the system date and time through the operating system that you installed. For additional information, see your operating system documentation. Note: If you have just powered on the BladeCenter unit, wait until the power on LED on the blade server flashes slowly before powering on the blade server. Installing the front bezel assembly The following illustration shows how to reinstall the front bezel assembly on the blade server. 34 QS21 Installation and User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110

Finishing
the
installation
To
complete
the
installation
you
must:
1.
Reinstall
the
front
bezel
assembly
on
the
blade
server
if
removed.
See
“Installing
the
front
bezel
assembly”
for
further
information.
2.
Ensure
there
is
a
DIMM
filler
or
a
DIMM
in
each
of
the
I/O
buffer
DIMM
slots.
3.
Replace
and
close
the
blade
server
cover.
See
“Closing
the
blade
server
cover”
on
page
36
for
further
information.
Statement
21:
CAUTION:
Hazardous
energy
is
present
when
the
blade
server
is
connected
to
the
power
source.
Always
replace
the
blade
cover
before
installing
the
blade
server.
4.
Reinstall
the
blade
server
into
the
BladeCenter
unit.
See
Chapter
3,
“Installing
the
blade
server,”
on
page
15
for
further
information.
5.
Turn
on
the
blade
server.
See
“Turning
on
the
blade
server”
on
page
9
for
further
information.
6.
If
you
have
replaced
the
battery
or
the
system
board
assembly,
reset
the
system
date
and
time
through
the
operating
system
that
you
installed.
For
additional
information,
see
your
operating
system
documentation.
Note:
If
you
have
just
powered
on
the
BladeCenter
unit,
wait
until
the
power
on
LED
on
the
blade
server
flashes
slowly
before
powering
on
the
blade
server.
Installing
the
front
bezel
assembly
The
following
illustration
shows
how
to
reinstall
the
front
bezel
assembly
on
the
blade
server.
34
QS21
Installation
and
User’s
Guide