Netgear GSM7248R GSM7224R / GSM7248R Hardware Installation Guide - Page 17
Hardware Installation, Package Contents - manual
View all Netgear GSM7248R manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Chapter 2 Hardware Installation This chapter explains how to install the hardware for the ProSafe™ 24-Port L2 Managed Switch with Static Routing GSM7224R and the ProSafe™ 48-Port L2 Managed Switch with Static Routing GSM7248R. Package Contents The switch is packed and shipped separately. The package contains the following items: • Managed Layer 2 Switch with preinstalled software • Power adapter cord • Rubber footpads for tabletop installation • Rubber caps for the SFP sockets • Rack-mounting kit • Null-modem serial cable (RS-232) with 9-pin connectors • Resource CD: The CD contains - Configuration software - Documentation including the Managed Layer 2 Switches 7200R Series CLI Reference Manual Version 7.0, the NETGEAR 7000 Series Managed Switch Administration Guide Version 6.0, the NETGEAR Installation Guide 7000 Series Managed Switch (7200R, 7300S), and this guide • Warranty and Support card • Installation guide • ProSafe NMS100 Network Management System 30-day trial CD-ROM 2-1 v1.0, November 2007