AMD AXDA3200DKV4E Data Sheet - Page 27

Exiting the Stop Grant State and Bus Connect Sequence, The Northbridge asserts CONNECT.

Page 27 highlights

26237C-May 2003 Preliminary Information AMD Athlon™ XP Processor Model 10 Data Sheet Figure 5 shows the signal sequence of events that takes the processor out of the Stop Grant state, connects the processor to the AMD Athlon system bus, and puts the processor into the Working state. ST PCLK # PROCRDY CONNECT CLKFWDRST Figure 5. Exiting the Stop Grant State and Bus Connect Sequence The following sequence of events removes the processor from the Stop Grant state and connects it to the system bus: 1. The Southbridge deasserts STPCLK#, informing the processor of a wake event. 2. When the processor recognizes STPCLK# deassertion, it exits the low-power state and asserts PROCRDY, notifying the Northbridge to connect to the bus. 3. The Northbridge asserts CONNECT. 4. The Northbridge deasserts CLKFWDRST, synchronizing the forwarded clocks between the processor and the Northbridge. 5. The processor issues a Connect special cycle on the system bus and resumes operating system and application code execution. Chapter 4 Power Management 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104

Chapter 4
Power Management
15
26237C—May 2003
AMD Athlon™ XP Processor Model 10 Data Sheet
Preliminary Information
Figure 5 shows the signal sequence of events that takes the
processor out of the Stop Grant state, connects the processor to
the AMD Athlon system bus, and puts the processor into the
Working state.
Figure 5.
Exiting the Stop Grant State and Bus Connect Sequence
The following sequence of events removes the processor from
the Stop Grant state and connects it to the system bus:
1. The
Southbridge
deasserts
STPCLK#,
informing
the
processor of a wake event.
2. When the processor recognizes STPCLK# deassertion, it
exits the low-power state and asserts PROCRDY, notifying
the Northbridge to connect to the bus.
3.
The Northbridge asserts CONNECT.
4.
The Northbridge deasserts CLKFWDRST, synchronizing the
forwarded
clocks
between
the
processor
and
the
Northbridge.
5.
The processor issues a Connect special cycle on the system
bus and resumes operating system and application code
execution.
STPCLK#
PROCRDY
CONNECT
CLKFWDRST