AMD AXDA3200DKV4E Data Sheet - Page 28

Connect State Diagram, Disconnect, Pending, Requested, Probe

Page 28 highlights

Preliminary Information AMD Athlon™ XP Processor Model 10 Data Sheet 26237C-May 2003 Connect State Diagram Figure 6 below and Figure 7 on page 17 show the Northbridge and processor connect state diagrams, respectively. 4/A Disconnect Pending 5/B 2/A 3/C Disconnect 7/D,C Connect 8 Reconnect Pending 1 3 Disconnect Requested 8 Probe Pending 2 6/C Probe 7/D Pending 1 Condition 1 A disconnect is requested and probes are still pending. 2 A disconnect is requested and no probes are pending. 3 A Connect special cycle from the processor. 4 No probes are pending. 5 PROCRDY is deasserted. 6 A probe needs service. 7 PROCRDY is asserted. Three SYSCLK periods after CLKFWDRST is deasserted. Although reconnected to the system interface, the 8 Northbridge must not issue any non-NOP SysDC commands for a minimum of four SYSCLK periods after deasserting CLKFWDRST. Action A Deassert CONNECT eight SYSCLK periods after last SysDC sent. B Assert CLKFWDRST. C Assert CONNECT. D Deassert CLKFWDRST. Figure 6. Northbridge Connect State Diagram 16 Power Management Chapter 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104

16
Power Management
Chapter 4
AMD Athlon™ XP Processor Model 10 Data Sheet
26237C—May 2003
Preliminary Information
Connect State
Diagram
Figure 6 below and Figure 7 on page 17 show the Northbridge
and processor connect state diagrams, respectively.
Figure 6.
Northbridge Connect State Diagram
Condition
1
A disconnect is requested and probes are still pending.
2
A disconnect is requested and no probes are pending.
3
A Connect special cycle from the processor.
4
No probes are pending.
5
PROCRDY is deasserted.
6
A probe needs service.
7
PROCRDY is asserted.
8
Three SYSCLK periods after CLKFWDRST is deasserted.
Although reconnected to the system interface, the
Northbridge must not issue any non-NOP SysDC
commands for a minimum of four SYSCLK periods after
deasserting CLKFWDRST
.
Action
A
Deassert CONNECT eight SYSCLK periods
after last SysDC sent.
B
Assert CLKFWDRST.
C
Assert CONNECT.
D
Deassert CLKFWDRST.
Disconnect
Pending
Connect
Disconnect
Requested
Reconnect
Pending
Probe
Pending 2
Disconnect
Probe
Pending 1
1
3
2/A
4/A
5/B
3/C
7/D,C
8
6/C
7/D
8