Brother International BAS-342G Instruction Manual - English - Page 21
Connecting the cords [8], INSTALLATION, <Main P.C. board>
View all Brother International BAS-342G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
4-13. Connecting the cords [8] NOTE: • Check that the connector is facing the correct way, and then insert it firmly until it locks into place. • Secure the cables with cable ties and cord clamps, while being careful not to pull on the connector. * Be sure to make the ground connection. (Refer to "4-14. Connecting the ground".) 4. INSTALLATION 1. Remove the cover of the control box. 2. Loosen the two screws (1), and then open the cord presser plate (2) in the direction of the arrow. 3. Pass the bundle of cords from the machine head through the hole in the table, and then pass it through the hole in the control box together with the following cords. • Tow-pedal foot switch (3) • Operation panel (Do not pass the ground wires through the hole.) • Solenoid valve assembly 4. Securely connect the connectors as indicated in the table below. 3977M Lock the cord clamp securely. 3978M Connector X pulse motor encoder 5-pin white Y pulse motor encoder 5-pin blue Intermittent presser foot pulse motor encoder 5-pin black Foot switch 10-pin Operation panel 8-pin Safety switch 3-pin Home position sensor assembly 12-pin STOP switch 6-pin Valve harness 12-pin Programmer relay harness 8-pin Fan 6-pin BAS-342G Connection location on main P.C. board P20 (X-ENC) P4 (Y-ENC) P5 (P-ENC) P6 (FOOT) P1 (PANEL) P9 (HEAD-SW) P8 (SENSOR1) P13 (HEAD) P12 (AIR1) P7 (PRG) P10 (SENSOR2) Cord clamp (3) (3) (3) (3) (3) (4) (4) (4) (4) (3) (4) (Continued on next page) 12