Brother International BAS-342G Instruction Manual - English - Page 21

Connecting the cords [8], INSTALLATION, <Main P.C. board&gt

Page 21 highlights

4-13. Connecting the cords [8] NOTE: • Check that the connector is facing the correct way, and then insert it firmly until it locks into place. • Secure the cables with cable ties and cord clamps, while being careful not to pull on the connector. * Be sure to make the ground connection. (Refer to "4-14. Connecting the ground".) 4. INSTALLATION 1. Remove the cover of the control box. 2. Loosen the two screws (1), and then open the cord presser plate (2) in the direction of the arrow. 3. Pass the bundle of cords from the machine head through the hole in the table, and then pass it through the hole in the control box together with the following cords. • Tow-pedal foot switch (3) • Operation panel (Do not pass the ground wires through the hole.) • Solenoid valve assembly 4. Securely connect the connectors as indicated in the table below. 3977M Lock the cord clamp securely. 3978M Connector X pulse motor encoder 5-pin white Y pulse motor encoder 5-pin blue Intermittent presser foot pulse motor encoder 5-pin black Foot switch 10-pin Operation panel 8-pin Safety switch 3-pin Home position sensor assembly 12-pin STOP switch 6-pin Valve harness 12-pin Programmer relay harness 8-pin Fan 6-pin BAS-342G Connection location on main P.C. board P20 (X-ENC) P4 (Y-ENC) P5 (P-ENC) P6 (FOOT) P1 (PANEL) P9 (HEAD-SW) P8 (SENSOR1) P13 (HEAD) P12 (AIR1) P7 (PRG) P10 (SENSOR2) Cord clamp (3) (3) (3) (3) (3) (4) (4) (4) (4) (3) (4) (Continued on next page) 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84

4. INSTALLATION
12
BAS-342G
4-13. Connecting the cords [8]
1. Remove the cover of the control box.
2. Loosen the two screws (1), and then
open the cord presser plate (2) in the
direction of the arrow.
3. Pass the bundle of cords from the
machine head through the hole in the
table, and then pass it through the
hole in the control box together with
the following cords.
Tow-pedal foot switch (3)
Operation panel (Do not pass the
ground wires through the hole.)
Solenoid valve assembly
4. Securely connect the connectors as
indicated in the table below.
<Main P.C. board>
NOTE:
Check that the connector is facing the
correct way, and then insert it firmly
until it locks into place.
Secure the cables with cable ties and
cord clamps, while being careful not to
pull on the connector.
*
Be sure to make the ground connection.
(Refer to "4-14. Connecting the ground".)
Connector
Connection location on
main P.C. board
Cord clamp
X pulse motor encoder 5-pin white
P20 (X-ENC)
(3)
Y pulse motor encoder 5-pin blue
P4 (Y-ENC)
(3)
Intermittent presser foot pulse motor encoder 5-pin black
P5 (P-ENC)
(3)
Foot switch 10-pin
P6 (FOOT)
(3)
Operation panel 8-pin
P1 (PANEL)
(3)
Safety switch 3-pin
P9 (HEAD-SW)
(4)
Home position sensor assembly 12-pin
P8 (SENSOR1)
(4)
STOP switch 6-pin
P13 (HEAD)
(4)
Valve harness 12-pin
P12 (AIR1)
(4)
Programmer relay harness 8-pin
P7 (PRG)
(3)
Fan 6-pin
P10 (SENSOR2)
(4)
(Continued on next page)
3978M
Lock the cord
clamp securely.
3977M