Dell Force10 S25-01-GE-24P Installing the S25P System - Page 13
Site Preparation, Site Selection
View all Dell Force10 S25-01-GE-24P manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
Chapter 2 Site Preparation This chapter describes requirements and procedures to install your S25P system, in the following topics: • Site Selection • Cabinet Placement on page 14 • Rack Mounting on page 14 • Fans and Airflow on page 14 • Power on page 15 • Storing Components on page 15 • Tools Required on page 16 For detailed S25P specifications, refer to Chapter 5, S25P Specifications, on page 33. Note: Install the S25P into a rack or cabinet before installing any optional components. Site Selection Make sure that the area where you install your S25P chassis meets the following safety requirements: • Near an adequate power source. Connect the system to the appropriate branch circuit protection as defined by your local electrical codes. • Ambient temperature between 32° - 122°F (0° - 40°C). • Relative humidity that does not exceed 85% non-condensing. • In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air vents or direct sunlight. • Away from sources of severe electromagnetic noise. • Positioned in a rack, cabinet, or on a desktop with adequate space in the front, rear, and sides of the unit for proper ventilation, and access. Installing the S25P System 13