Dell Force10 S25-01-GE-24P Installing the S25P System - Page 22
Four-Post Rack-mounting with Cage Nuts,
View all Dell Force10 S25-01-GE-24P manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 22 highlights
Four-Post Rack-mounting with Cage Nuts Ensure that there is adequate clearance surrounding the cabinet or rack to permit access and airflow. If you are installing two S25P systems side-by-side, position them at least 5 inches (12.7 cm) apart. Follow the steps below to install the S25P chassis into a four-post rack mounting with cage nuts. Step 1 Task Attach the two rear brackets to the side panels. Align the three holes in the bracket with the three holes on the S25P chassis, and secure the brackets to the chassis using the screws. Figure 10 Four-Post Rack-mounting with Cage Nuts Top View of Brackets Stack ID AC1 XFP25 XFP26 AACla2rm 27 P28 S25-01-GE-24P Align brackets fn00147f_s25P 2 Align and secure the adjustable bracket onto the rear bracket. 3 Insert the S25P chassis into the rear of the rack. Position and secure the chassis with two screws into each front bracket flange and into the rack post. Figure 11 Four-Post Rack-mounting with Cage Nuts Stack ID AC1 XFP25 XFP26 AACla2rm 27 P28 S25-01-GE-24P fn00147a_s25P 22 Installing the S25P