Fluke 125B/S Calibration Guide - Page 35
Input A and B Phase Measurements Test, Harmonics Test (125B)
View all Fluke 125B/S manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
Industrial ScopeMeter Performance Verification Input A and B Phase Measurements Test To test the Input A and B phase measurements: 1. Connect the Test Tool to the Calibrator. See Figure 6. 2. Set up the Test Tool: a. Push . b. Push to open the INPUT A MEASUREMENTS menu. c. Select Phase. d. Push . e. Push . f. Push to open the INPUT B MEASUREMENTS menu. g. Select Phase. h. Push . 3. Push or to set 1 V/div for Input A and Input B. 4. Set up the Calibrator: a. Supply a sine wave. b. Supply the voltage and frequency in Table 8 (NORMAL output, WAVE sine). c. Push . 5. Compare the Input A and Input B main reading to the limit in Table 8. Table 8. Volts Peak Verification Points 1.5 V Calibrator Output V rms (Sine Calibrator Frequency 1 kHz Limit A-B -2 degrees to +2 degrees Harmonics Test (125B) To test the harmonics: 1. Connect the Test Tool to the Calibrator. See Figure 6. 2. Setup the Test Tool: a. Push to open MENU. b. Push to highlight POWER HARMONICS. c. Push to open the SETTINGS menu. d. Select Probe B: Select. e. Push . f. Select SENSITIVITY: 10 mV/A. 3. Set up the CalibratorCalibrator: a. Supply a square wave. b. Supply 2.5 Vpp, 60 Hz (NORMAL output, WAVE square). c. Push . 27