Haier AB122MCERA Operation Manual - Page 23
Ab182-282mcera
View all Haier AB122MCERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
Installation Procedures 2. Location Relationship among Ceiling Hole, Unit and Hoisting Studs AB092-162MCERA ...gap between studs 535.7.1m indoor unit 570mm ceiling 650mm decorated board 700mmi' indoor unit 570mm • E E OO OccEoo 0) '2 .O0 sa 08a) • The ceiling and decorated board overlapping part should be more than mm holder E E 0E C•I ceiling E decorated board 0 AB182-282MCERA AB182-282MEERA pipe connector model AB CD AB182-282MCERA 680 840 890 950 AB182-282MEERA ceiling hoisting foot hoisting foot over 20 Amm(hoiting stud ga4) Bmm(indoor unit) Cmm* (ceiling hole) Dmm(decorated board) NB: The size of ceiling hole with *can be up to 910mm,but the overlapping part of ceiling and decorated board should be kept above 20mm AB302-482MCERA AB302-482MEERA 860-890mm(ceiling hole) 620mm(hoiting stud gap) 0CD _C 950mm(decorated board) 890mm(ceiling hole) 840mm(indoor unit) 780mm(hoiting stud gar) E cO O o Note: Before suspending the indoor unit, select the installation location according to the piping and wiring in the ceiling, and determine the lead direction of the piping. Prepare all pipes (refrigerator and drainage) and wiring (connection line for remote control and connection line of indoor units and outdoor units) connected to indoor units before suspending the indoor unit so as to make the connections right after the installation. • In the situation with the ceiling, before suspending the unit, set refrigerant pipe, drainpipe, connection line in the room, lead wire of line control to the locations of piping and wiring. • Confirm the size of the indoor unit and fix it according to the requirements in the manual. 21