Haier AB122MCERA Operation Manual - Page 23

Ab182-282mcera

Page 23 highlights

Installation Procedures 2. Location Relationship among Ceiling Hole, Unit and Hoisting Studs AB092-162MCERA ...gap between studs 535.7.1m indoor unit 570mm ceiling 650mm decorated board 700mmi' indoor unit 570mm • E E OO OccEoo 0) '2 .O0 sa 08a) • The ceiling and decorated board overlapping part should be more than mm holder E E 0E C•I ceiling E decorated board 0 AB182-282MCERA AB182-282MEERA pipe connector model AB CD AB182-282MCERA 680 840 890 950 AB182-282MEERA ceiling hoisting foot hoisting foot over 20 Amm(hoiting stud ga4) Bmm(indoor unit) Cmm* (ceiling hole) Dmm(decorated board) NB: The size of ceiling hole with *can be up to 910mm,but the overlapping part of ceiling and decorated board should be kept above 20mm AB302-482MCERA AB302-482MEERA 860-890mm(ceiling hole) 620mm(hoiting stud gap) 0CD _C 950mm(decorated board) 890mm(ceiling hole) 840mm(indoor unit) 780mm(hoiting stud gar) E cO O o Note: Before suspending the indoor unit, select the installation location according to the piping and wiring in the ceiling, and determine the lead direction of the piping. Prepare all pipes (refrigerator and drainage) and wiring (connection line for remote control and connection line of indoor units and outdoor units) connected to indoor units before suspending the indoor unit so as to make the connections right after the installation. • In the situation with the ceiling, before suspending the unit, set refrigerant pipe, drainpipe, connection line in the room, lead wire of line control to the locations of piping and wiring. • Confirm the size of the indoor unit and fix it according to the requirements in the manual. 21

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

Installation
Procedures
2.
Location
Relationship
among
Ceiling
Hole,
Unit
and
Hoisting
Studs
AB092-162MCERA
950mm(decorated
board)
indoor
unit
570mm
E
E
O
co
co
0)
...gap
between
studs
535
.
7
.
1m
indoor
unit
570mm
ceiling
650mm
decorated
board
700mm
i
'
E
O
O
'2
O
.0
8
a)
0
sa
The
ceiling
and
decorated
board
overlapping
part
should
be
more
than
mm
holder
E
E
E
0
C•I
ceiling
decorated
board
AB182-282MCERA
AB182-282MEERA
890mm(ceiling
hole)
840mm(indoor
unit)
780mm(hoiting
stud
gar)
Amm(hoiting
stud
ga4)
Bmm(indoor
unit)
Cmm*
(ceiling
hole)
Dmm(decorated
board)
AB302-482MCERA
AB302-482MEERA
pipe
connector
ceiling
hoisting
foot
E
0
model
A
B
C
D
AB182-282MCERA
AB182-282MEERA
680
840 890
950
hoisting
foot
over
20
NB:
The
size
of
ceiling
hole
with
*can
be
up
to
910mm,but
the
overlapping
part
of
ceiling
and
decorated
board
should
be
kept
above
20mm
860-890mm(ceiling
hole)
620mm(hoiting
stud
gap)
CD
0
_C
E
O
O
co
Note:
Before
suspending
the
indoor
unit,
select
the
installation
location
according
to
the
piping
and
wiring
in
the
ceiling,
and
determine
the
lead
direction
of
the
piping.
Prepare
all
pipes
(refrigerator
and
drainage)
and
wiring
(connection
line
for
remote
control
and
connection
line
of
indoor
units
and
outdoor
units)
connected
to
indoor
units
before
suspending
the
indoor
unit
so
as
to
make
the
connections
right
after
the
installation.
In
the
situation
with
the
ceiling,
before
suspending
the
unit,
set
refrigerant
pipe,
drainpipe,
connection
line
in
the
room,
lead
wire
of
line
control
to
the
locations
of
piping
and
wiring.
Confirm
the
size
of
the
indoor
unit
and
fix
it
according
to
the
requirements
in
the
manual.
21