Haier AB122MCERA Operation Manual - Page 29

eccentricity, adjustment, max.20m4, bending, clamp, indoor, attached, insulatirtg, insulating,

Page 29 highlights

Installation Procedures CPiping Materials & Heat Insulating Material As to prevent condensation, heat insulating treatment should be performed. The heat insulating treatment for piping should be done respectively. (Hose) Piping Material Hard PVC tube VP31. 5mm(inner bore) Heat Insulating Vesicant polythene Material thickness: over 7mm The attached hoses can be used to adjust the eccentricity and angle of the hard PVC tube. • Stretch the hose directly to make connections as to avoid distortion. The soft end of the hose should be positioned with a clamp. • The hose should be used in the horizon direction. eccentricity adjustment (max.20m4) hose clamp 45 bending (max.) hose hose indoor unit Heat Insulating Treatment: • Wrap the connection between the clamp and the root segment of the indoor unit without any gap with heat insulating materials as shown in the drawing CIFifting Drainpipe hose hose clamp The drainpipe can be lifted 360mm. When the down gradient of the drainpipe can't be ensured, after upright lifting, the drainpipe is in the down slope. (Confirming Drainag insauttlaatcinhgedmhaeteartialhmheaoatmet irniinaseluslastiprtvgc pipe The drainage should be confirmed during the test run to make sure that there is leakage at the connection. The confirmation of drainage should be also performed during the installation in the winter season. Fill water from the outlet or the specified position and confirm the drainage. Fill 600cc water with a hose from the outlet or the specified location on the machine. Add the water slowly. Don't add water to the motor of the drainage pump. • After mounting the electrical system, do cooling operation and meanwhile add water and check. • If the electrical installation hasn't been completed, pull out the terminal(2P) of the floater switch on the electrical cabinet. After confirming the drainage, connect the terminal of the floater switch and run the drainage pump for 5 minutes until it stops automatically. • Confirm the sound of the motor: Confirm the sound of the motor of the drainage pump and meanwhile check the drainage. 2 co.CS _E _a 100mm rn below indoor unit/ under the ceiling joint of drainpipe 27

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

Installation
Procedures
CPiping
Materials
&
Heat
Insulating
Material
As
to
prevent
condensation,
heat
insulating
treatment
should
be
performed.
The
heat
insulating
treatment
for
piping
should
be
done
respectively.
(Hose)
Piping
Material
Hard
PVC
tube
VP31.
5mm(inner
bore)
Heat
Insulating
Material
Vesicant
polythene
thickness:
over
7mm
The
attached
hoses
can
be
used
to
adjust
the
eccentricity
and
angle
of
the
hard
PVC
tube.
Stretch
the
hose
directly
to
make
connections
as
to
avoid
distortion.
The
soft
end
of
the
hose
should
be
positioned
with
a
clamp.
The
hose
should
be
used
in
the
horizon
direction.
eccentricity
adjustment
(max.20m4)
45
bending
(max.)
hose
hose
clamp
indoor
unit
hose
Heat
Insulating
Treatment:
Wrap
the
connection
between
the
clamp
and
the
root
segment
of
the
indoor
unit
without
any
gap
with
heat
insulating
materials
as
shown
in
the
drawing
CI
F
ifting
Drainpipe
The
drainpipe
can
be
lifted
360mm.
When
the
down
gradient
of
the
drainpipe
can't
be
ensured,
after
upright
lifting,
the
drainpipe
is
in
the
down
slope.
(Confirming
Drainag
The
drainage
should
be
confirmed
during
the
test
run
to
make
sure
that
there
is
leakage
at
the
connection.
The
confirmation
of
drainage
should
be
also
performed
during
the
installation
in
the
winter
season.
Fill
water
from
the
outlet
or
the
specified
position
and
confirm
the
drainage.
Fill
600cc
water
with
a
hose
from
the
outlet
or
the
specified
location
on
the
machine.
Add
the
water
slowly.
Don't
add
water
to
the
motor
of
the
drainage
pump.
After
mounting
the
electrical
system,
do
cooling
operation
and
meanwhile
add
water
and
check.
If
the
electrical
installation
hasn't
been
completed,
pull
out
the
terminal(2P)
of
the
floater
switch
on
the
electrical
cabinet.
After
confirming
the
drainage,
connect
the
terminal
of
the
floater
switch
and
run
the
drainage
pump
for
5
minutes
until
it
stops
automatically.
Confirm
the
sound
of
the
motor:
Confirm
the
sound
of
the
motor
of
the
drainage
pump
and
meanwhile
check
the
drainage.
hose
hose
clamp
attached
heat
heat
insulatirtg
insulating
material
material
hominess
pvc
pipe
2
co.S
C
_E
_a
100mm
rn
below
indoor
unit/
under
the
ceiling
joint
of
drainpipe
27