Haier AB122MCERA Operation Manual - Page 29
eccentricity, adjustment, max.20m4, bending, clamp, indoor, attached, insulatirtg, insulating,
View all Haier AB122MCERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 29 highlights
Installation Procedures CPiping Materials & Heat Insulating Material As to prevent condensation, heat insulating treatment should be performed. The heat insulating treatment for piping should be done respectively. (Hose) Piping Material Hard PVC tube VP31. 5mm(inner bore) Heat Insulating Vesicant polythene Material thickness: over 7mm The attached hoses can be used to adjust the eccentricity and angle of the hard PVC tube. • Stretch the hose directly to make connections as to avoid distortion. The soft end of the hose should be positioned with a clamp. • The hose should be used in the horizon direction. eccentricity adjustment (max.20m4) hose clamp 45 bending (max.) hose hose indoor unit Heat Insulating Treatment: • Wrap the connection between the clamp and the root segment of the indoor unit without any gap with heat insulating materials as shown in the drawing CIFifting Drainpipe hose hose clamp The drainpipe can be lifted 360mm. When the down gradient of the drainpipe can't be ensured, after upright lifting, the drainpipe is in the down slope. (Confirming Drainag insauttlaatcinhgedmhaeteartialhmheaoatmet irniinaseluslastiprtvgc pipe The drainage should be confirmed during the test run to make sure that there is leakage at the connection. The confirmation of drainage should be also performed during the installation in the winter season. Fill water from the outlet or the specified position and confirm the drainage. Fill 600cc water with a hose from the outlet or the specified location on the machine. Add the water slowly. Don't add water to the motor of the drainage pump. • After mounting the electrical system, do cooling operation and meanwhile add water and check. • If the electrical installation hasn't been completed, pull out the terminal(2P) of the floater switch on the electrical cabinet. After confirming the drainage, connect the terminal of the floater switch and run the drainage pump for 5 minutes until it stops automatically. • Confirm the sound of the motor: Confirm the sound of the motor of the drainage pump and meanwhile check the drainage. 2 co.CS _E _a 100mm rn below indoor unit/ under the ceiling joint of drainpipe 27