Haier AB122MCERA Operation Manual - Page 26
deflector, swing, orifice, location
View all Haier AB122MCERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
Installation Procedures 0 AB182-482MEERA ED As shown in Fig. 1, make the wind deflector motor of the decorated board face to the orifice of the indoor unit, and then mount the decorated board onto the body of the indoor unit. swing ring T orifice location deflector moto 4 Fig.1 o Mounting the decorated board: a. Hang temporarily the two swing rings opposite to the deflector motor of the decorated board on the ring stators of the swing rings of the indoor unit; b. Hang temporarily the other two swing rings on the ring stators of the swing rings of the indoor unit (take care not to get the lead wire of the deflector motor into the sealing); c. Screw all 4 hex head screws under the rings about 15mm to lift the board; d. Turn and adjust the decorated board in the direction of arrow as shown in Fig. 4 until it covers the hole of the ceiling. e. Fasten the screw to keep the thickness of the sealing between the decorated board and the unit body within 5-8mm, as shown in Fig. 2. indoor unit sealing ceiling material \ t 5-8mm decorated board Fig.2 f. Mount the wiring of the decorated board according to the mounting drawing attached to the inside of the machine; g. Check with the controller if the mounting is correct and make sure if the machine works normally; h. Mount the air inlet grid and corner covers. 24