HP 12000 HP 12200 Gateway Virtual Library System User Guide (BW403-10001, June - Page 75
Operation, Powering on the VLS12200 System, Rebooting the System
View all HP 12000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 75 highlights
7 Operation This section describes how to power on and power off the VLS nodes. Powering on the VLS12200 System 1. Power on all arrays connected to the VLS. 2. Power on the two private LAN switches connected to the VLS. 3. Plug the VLS nodes' AC power cords into a power source if not already connected. 4. Press the VLS secondary nodes' Power On/Standby button. After the secondary nodes are powering up, press the primary node's Power On/Standby button. 5. Confirm that the VLS components are all functioning normally and the VLS is cabled correctly by observing the condition of their status LEDs. The LED status should match those shown in the following table. If an LED status does not match the status shown in the following table, a component needs attention. Figure 10 VLS12200 node LED status during normal operation Item Description 1 Internal health LED 2 External health LED (power supply) 3 NIC 1 link LED 4 NIC 2 link LED 5 Power supply LEDs Status LED is green. LED is green. LED is green if primary node. LED is off if secondary node. LED is green. LED is green. 6. Rebooting the system is complete when you receive the "Initializing node#", then "Initializing for node# completed." messages for all nodes in the systems notifications. Rebooting the System To reboot the system from VLS CLI: 1. Verify that any backup or restore operation has completed and that the VLS is idle. 2. Open a secure shell session and log in as the administrator. See "Opening a Secure Shell Session" (page 82). 3. Initiate a reboot of the VLS by entering: restartSystem Powering on the VLS12200 System 75