HP Cisco MDS 9020 Cisco MDS 9100 Series Hardware Installation Guide (OL-17951- - Page 76

Rack-Mounting Guidelines, Rack Type, MDS 9513, EIA 4-post, Telco 2 post

Page 76 highlights

Cisco MDS 9000 Family Telco and EIA Shelf Bracket Appendix A Cabinet and Rack Installation Send documentation comments to [email protected] Note This optional kit is not provided with the switch; to order the kit, contact your switch supplier. This section describes the procedure for installing a Cisco MDS 9000 Family switch in a rack or cabinet using the optional telco and EIA Shelf Bracket Kit. This section includes the following information: • Rack-Mounting Guidelines, page A-4 • Before Installing the Shelf Brackets, page A-5 - Required Equipment, page A-5 - Installing the Shelf Bracket Kit into a Four-Post EIA Rack, page A-7 - Installing the Shelf Bracket Kit into a Two-Post Telco Rack, page A-5 - Installing the Switch on the Shelf Brackets, page A-8 - Removing the Shelf Bracket Kit (Optional), page A-9 Rack-Mounting Guidelines Caution If the rack is on wheels, ensure that the brakes are engaged or the rack is otherwise stabilized. Caution If installing this kit in an EIA rack, attach the switch to all four rack-mounting rails; the EIA rails may not be thick enough to prevent flexing of the shelf brackets if only two rails are used. Before rack-mounting the chassis, ensure that the cabinet or rack meets the following requirements: • The specifications listed in the "Cabinet and Rack Requirements" section on page A-1. • The depth of the rack between the front and rear mounting rails is at least 18 in. (45.7 cm) but less than or equal to 30 in. (76.2 cm). This is specific to four-post EIA cabinets or racks. • The airflow and cooling are adequate and there is sufficient clearance around the air vents on the switch, as described in Appendix B, "Technical Specifications." This is particularly important to verify if you are installing the switch in an enclosed cabinet. • The rack has sufficient vertical clearance for the chassis plus two rack units for the shelf brackets, and any desired clearance for the installation process. • The rack meets the minimum rack load ratings per rack unit (RU) listed in the following table. Rack Type EIA (4-post) Telco (2 post) MDS 9513 45 lb Do not use. MDS 9509 45 lb Do not use. MDS 9506 30 lb 60 lb MDS 9216 15 lb 30 lb MDS 9100 7.5 lb 15 lb Cisco MDS 9100 Series Hardware Installation Guide A-4 OL-17951-02

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108

Send documentation comments to [email protected]
A-4
Cisco MDS 9100 Series Hardware Installation Guide
OL-17951-02
Appendix A
Cabinet and Rack Installation
Cisco MDS 9000 Family Telco and EIA Shelf Bracket
Note
This optional kit is not provided with the switch; to order the kit, contact your switch supplier.
This section describes the procedure for installing a Cisco MDS 9000 Family switch in a rack or cabinet
using the optional telco and EIA Shelf Bracket Kit. This section includes the following information:
Rack-Mounting Guidelines, page A-4
Before Installing the Shelf Brackets, page A-5
Required Equipment, page A-5
Installing the Shelf Bracket Kit into a Four-Post EIA Rack, page A-7
Installing the Shelf Bracket Kit into a Two-Post Telco Rack, page A-5
Installing the Switch on the Shelf Brackets, page A-8
Removing the Shelf Bracket Kit (Optional), page A-9
Rack-Mounting Guidelines
Caution
If the rack is on wheels, ensure that the brakes are engaged or the rack is otherwise stabilized.
Caution
If installing this kit in an EIA rack, attach the switch to all four rack-mounting rails; the EIA rails may
not be thick enough to prevent flexing of the shelf brackets if only two rails are used.
Before rack-mounting the chassis, ensure that the cabinet or rack meets the following requirements:
The specifications listed in the
“Cabinet and Rack Requirements” section on page A-1
.
The depth of the rack between the front and rear mounting rails is at least 18 in. (45.7 cm) but less
than or equal to 30 in. (76.2 cm). This is specific to four-post EIA cabinets or racks.
The airflow and cooling are adequate and there is sufficient clearance around the air vents on the
switch, as described in
Appendix B, “Technical Specifications.”
This is particularly important to
verify if you are installing the switch in an enclosed cabinet.
The rack has sufficient vertical clearance for the chassis plus two rack units for the shelf brackets,
and any desired clearance for the installation process.
The rack meets the minimum rack load ratings per rack unit (RU) listed in the following table.
Rack Type
MDS 9513
MDS 9509
MDS 9506
MDS 9216
MDS 9100
EIA (4-post)
45 lb
45 lb
30 lb
15 lb
7.5 lb
Telco (2 post)
Do not use.
Do not use.
60 lb
30 lb
15 lb