HP Integrity Superdome SX1000 Site Preparation Guide, Fifth Edition - HP Integ - Page 73
Typical Installation Schedule, Delivery survey completed
View all HP Integrity Superdome SX1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 73 highlights
Pre-Installation Survey Typical Installation Schedule Typical Installation Schedule The following schedule lists the sequence of events for a typical system installation: • 60 days before installation - Floor plan design completed and mailed to Hewlett-Packard • 30 days before installation - Primary power and air conditioning installation completed - Telephone and data cables installed - Fire protection equipment installed - Major facility changes completed - Special delivery requirements defined - Site inspection survey completed - Delivery survey completed - Signed copy of the site inspection and delivery survey mailed to Hewlett-Packard - Site inspection and pre-delivery coordination meeting arranged with a Hewlett-Packard representative to review the inspection checklist and arrange an installation schedule. • 7 days before installation - Final check made with a Hewlett-Packard customer engineer to resolve any last-minute problems Chapter 6 65