HP Integrity Superdome SX1000 Site Preparation Guide, Fifth Edition - HP Integ - Page 77
Please check either Yes or No. If No, include comment or date, Comment, or Date, Area or Condition
View all HP Integrity Superdome SX1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 77 highlights
Pre-Installation Survey Site Inspection Table 6-2 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment or date Comment or Date 26. Are there any equipment servicing hazards (loose ground wires, poor lighting, etc.)? Cooling No. Area or condition Yes No 27. Can cooling be maintained between 68° and 77° (20° and 25° C)? 28. Can temperature changes be held to 9° (5 ° C) per hour? 29. Can humidity level be maintained between 40% and 55%? 30. Are air conditioning filters installed and clean? Storage No. Area or condition Yes No 31. Are cabinets available for tape and disc media? 32. Is shelving available for documentation? Training No. Area or Condition 33 Are personnel enrolled in the System Administrator's Course? 34 Is on-site training required? Chapter 6 69