HP Integrity Superdome SX1000 Site Preparation Guide, Fifth Edition - HP Integ - Page 80
Delivery Survey Part 2
View all HP Integrity Superdome SX1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 80 highlights
Pre-Installation Survey Delivery Survey Figure 6-2 Delivery Survey (Part 2) ELEVATOR Fill in the following information if an elevator is required to move equipment. Capacity (lb or kg) Depth Height Width Depth Height Width STAIRS Please list number of flights and stairway dimensions. Number of flights Width Width Number of flights Width Width Width Width 60SP019A 11/24/99 72 Chapter 6
Chapter 6
Pre-Installation Survey
Delivery Survey
72
Figure 6-2
Delivery Survey (Part 2)
Depth
Width
Width
Width
STAIRS
Width
ELEVATOR
Height
Fill in the following information if an elevator is required to move equipment.
Capacity (lb or kg)
Please list number of flights and stairway dimensions.
Number of flights
11/24/99
60SP019A
Depth
Width
Width
Number of flights
Width
Width
Height