LG ARUB115BT2 Installation Manual - Page 32
Refrigerant piping system
View all LG ARUB115BT2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 32 highlights
Refrigerant piping installation Refrigerant piping system Example : 3 outdoor units, 4 HR units and 11 indoor units Outdoor unit Y branch HR unit Indoor unit Slave 1 A2 Master A1 H h F2 E F1 E2 E1 A B1 D1 a D2 b B C1 C1 c D3 d B2 "a" C3 C2 g D4 C2 D7 f e D C3 i "b" C4 jk D9 D8 * D10 D6 D5 I Case 1 ("a") : Maximum height is 15m(236ft) if you install with Y branch. I Case 2 ("b") : Height is zero(0) m in HR unit serial connector. WARNING * : Serial connection of HR units : Capacity sum of indoor units ≤ 160kBtu/hr • Refer to the HR unit PCB part for the valve group control setting. • It is recommended that difference in pipe lengths between an HR unit and indoor units, for example difference in length of a, b, c, and d, be minimized. The larger difference in pipe lengths, the more different performance between indoor units. • Piping length from outdoor branch to outdoor unit ≤ 10m(33ft), equivalent length : max 13m(43ft) (For 18 HP or more) ❈ If the large capacity indoor units(5~10 HP, using over Ø15.88(5/8) / Ø9.52(3/8))are installed, it should use Valve Group setting. 32 Outdoor Unit