LG ARUB115BT2 Installation Manual - Page 57
Flow chart of manual addressing for pipe detection
View all LG ARUB115BT2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 57 highlights
ENGLISH Flow chart of manual addressing for pipe detection HR Unit PCB Execute in case of Auto pipe detection failure Wait for about 5 minutes. Turn No.1 of SW02M of HR unit PCB on. Reset the power of HR unit PCB. The number of the indoor units installed is displayed. Ex)HR ➠ The number of the indoor Enter the central control address into each indoor unit using its wired remote control. On the HR unit PCB, manually set address of each valve of the HR unit to the central control address of the indoor unit connected to the valve. Are the number of indoor units connected to the outdoor unit and displayed one equal? YES NO Check the central control address of indoor and HR unit. Turn No.6 of SW03M of outdoor unit PCB off. Make sure that reset the outdoor unit power when changing the central control unit Turn No.6 of SW03M of outdoor unit PCB on. Completion of manual pipe detection Reset the power of outdoor unit PCB. Installation Manual 57