LG ARUB115BT2 Installation Manual - Page 43
Control box and connecting position of wiring
View all LG ARUB115BT2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 43 highlights
ENGLISH Electrical Wiring Control box and connecting position of wiring - Remove all of the screws on front panel, and remove the front panel by pulling it forward. - Connect communication line between master and slave outdoor unit through the terminal block. - Connect communication lines between outdoor unit and indoor units through the terminal block. - When the central control system is connected to the outdoor unit, a dedicated PCB must be connected between them. - When connecting communication line between outdoor unit and indoor units with shielded wire, connect the shield ground to the earth screw. Front Panel WARNING The temperature sensor for outdoor air should not be exposed to direct sunlight. - Provide an appropriate cover to intercept direct sunlight. UW1 Chassis(208/230V) Inverter PCB Inverter FAN PCB Noise Filter Main PCB Magnet switch Take care of the phase sequence of 3-phase 3-wire power system Installation Manual 43