Maytag MDB7609AWB Installation Instructions - Page 7

Installationinstructions - lowes

Page 7 highlights

INSTALLATIONINSTRUCTIONS Prepare Cabinet Opening--Existing Utilities Electrical Shock Hazard Disconnect electrical power at the fuse box or circuit breaker box before installing dishwasher. Failure to do so can result in death or electrical shock. breaker box before insta!ling dishwashe_ Yes _F0]low instructions in the "Prepa[e cabinet Opening_Existing utilities,' section: NO _FolloW instrUCtionS inthe ,,Prepare Cabinet .... Open!ng_New Ut!lit!es'! section: E :isting g t ity hookups Water line If the water line and the cable extend to the locations shown, proceed to the "Install Drain Hose" section. If they do not reach far enough, follow the instructions in the "Prepare Cabinet Opening--New Utilities" section. Prepare Cabinet Opening--New Utilities Prepare and route the electrical supply What type of electrical connection will you use? L DFOirellcotw Woipreti:on B inst[uctionS Option A, Power Supply Cord: NOTE: A grounded 3 prong outlet is required inside a cabinet next to the dishwasher cabinet opening. Drill a 1 1/2" (3.8 cm) hole in cabinet side or rear. See product and cabinet opening dimensions. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

INSTALLATIONINSTRUCTIONS
Electrical
Shock Hazard
Disconnect
electrical
power
at the
fuse
box
or circuit
breaker
box
before
installing
dishwasher.
Failure
to do
so can
result
in death or
electrical
shock.
breaker
box
before
insta!ling
dishwashe_
Yes
_F0]low
instructions
in the "Prepa[e
cabinet
Opening_Existing
utilities,'
section:
NO
_FolloW
instrUCtionS inthe
,,Prepare
Cabinet
....
Open!ng_New
Ut!lit!es'!
section:
E :isting
g
t
ity
hookups
Water
line
Prepare
Cabinet
Opening--Existing
Utilities
If the
water
line and the cable
extend
to the locations
shown,
proceed
to the
"Install
Drain
Hose"
section.
If they
do not reach far enough,
follow
the
instructions
in the
"Prepare
Cabinet
Opening--New
Utilities"
section.
Prepare
Cabinet
Opening--New
Utilities
Prepare
and
route
the
electrical
supply
What
type
of electrical
connection
will
you
use?
L
Direct
Wire:
FOllow
option
B
inst[uctionS
Option
A, Power
Supply Cord:
NOTE:
A grounded
3 prong
outlet
is required
inside
a
cabinet
next to the
dishwasher
cabinet
opening.
Drill
a 1 1/2" (3.8 cm) hole
in cabinet
side
or rear.
See product
and cabinet
opening
dimensions.
7