3Com 5500-EI Getting Started Guide - Page 43

Placing Units On Top of Each Other, The Power-up Sequence, Powering-up the Switch 5500

Page 43 highlights

Placing Units On Top of Each Other 43 CAUTION: When you use the Phillips screwdriver or power screwdriver to fasten captive screws on both sides of the module, make sure the captive force moment is not larger than 0.4 Nom. Placing Units On Top of Each Other If the switch units are free-standing, you can stack up to eight units. If you are mixing a variety of switches, make sure to place the smaller units at the top. If you are stacking switch units, apply the supplied self-adhesive rubber feet to the underside of each switch. Stick one in the marked area at each corner. Place the switch units on top of each other, ensuring that the feet of the upper unit sit fully on the lower unit. The Power-up Sequence The following sections describe how to prepare your Switch 5500 for operation. Powering-up the To power-up the switch: Switch 5500 1 Plug the power cord into the power socket at the back of the switch. 2 Plug the other end of the power cord into your power outlet. The switch powers-up and runs through its Power On Self Test (POST), which takes approximately one minute. Checking for Correct During the POST, all ports on the switch are disabled and the LEDs blink in Operation of LEDs a rapid sequence. When the POST has completed, check the Unit Status to make sure that your switch is operating correctly. Table 17 describes the possible LED colors.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151

Placing Units On Top of Each Other
43
CAUTION:
When you use the Phillips screwdriver or power screwdriver to
fasten captive screws on both sides of the module, make sure the captive
force moment is not larger than 0.4 Nom.
Placing Units On
Top of Each Other
If the switch units are free-standing, you can stack up to eight units. If
you are mixing a variety of switches, make sure to place the smaller units
at the top.
If you are stacking switch units, apply the supplied self-adhesive rubber
feet to the underside of each switch. Stick one in the marked area at each
corner. Place the switch units on top of each other, ensuring that the feet
of the upper unit sit fully on the lower unit.
The Power-up
Sequence
The following sections describe how to prepare your Switch 5500 for
operation.
Powering-up the
Switch 5500
To power-up the switch:
1
Plug the power cord into the power socket at the back of the switch.
2
Plug the other end of the power cord into your power outlet.
The switch powers-up and runs through its Power On Self Test (POST),
which takes approximately one minute.
Checking for Correct
Operation of LEDs
During the POST, all ports on the switch are disabled and the LEDs blink in
a rapid sequence.
When the POST has completed, check the Unit Status to make sure that
your switch is operating correctly. Table 17 describes the possible LED
colors.