Cisco 7609-S Installation Guide - Page 44

Task No., Planning Activity, Verified

Page 44 highlights

Site Preparation Checklist Chapter 2 Preparing for Installation Table 2-6 Site Planning Checklist Task No. Planning Activity Verified By Time Date 1 Space evaluation: Space and layout Floor covering Impact and vibration Lighting Maintenance access 2 Environmental evaluation: Ambient temperature Humidity Altitude Atmospheric contamination Airflow 3 Power evaluation: Input power type Power receptacles Receptacle proximity to the equipment Dedicated (separate) circuits for redundant Power supplies UPS for power failures DC systems: Proper gauge wire and lugs 4 Grounding evaluation: Circuit breaker size CO ground (AC- and DC-powered systems) 5 Cable and interface equipment evaluation: Cable type Connector type Cable distance limitations Interface equipment (transceivers) 6 EMI evaluation: Distance limitations for signaling Site wiring RFI levels 2-12 Cisco 7609 Internet Router Installation Guide OL-5079-04

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120

Chapter 2
Preparing for Installation
Site Preparation Checklist
2-12
Cisco 7609 Internet Router Installation Guide
OL-5079-04
Table 2-6
Site Planning Checklist
Task No.
Planning Activity
Verified By
Time
Date
1
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
2
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
3
Power evaluation:
Input power type
Power receptacles
Receptacle proximity to the equipment
Dedicated (separate) circuits for redundant
Power supplies
UPS for power failures
DC systems: Proper gauge wire and lugs
4
Grounding evaluation:
Circuit breaker size
CO ground (AC- and DC-powered systems)
5
Cable and interface equipment evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6
EMI evaluation:
Distance limitations for signaling
Site wiring
RFI levels