D-Link DIS-200G User Manual - Page 11

LED Indicators, All Switches

Page 11 highlights

DIS-200G Series Layer 2 Gigabit Industrial Smart Managed Switch Hardware Installation Guide LED Indicators All Switches Below is an overview of the LED indicators present on all switch models in the DIS-200G series. LED 1 SYS 2 ALM 3 PWR 1 4 PWR 2 5 PWR 3 6 Ports 11 - 12 Figure 1-4 LED indicators for all DIS-200G Series switches Description Solid green The DIS-200G switch is on and accepting web connections. Blinking green A firmware update is in progress. Solid amber The DIS-200G switch is not ready for communication. Blinking amber The DIS-200G switch is booting up, or PoE has failed during system operation (DIS-200G-12PS/PSW PoE models only). Solid amber The power supply to the DIS-200G has failed. Solid green Power source 1 is connected. Solid green Power source 2 is connected. Solid green Solid green Blinking green Power source 3 is connected. Port is connected at 1 Gbps. There is activity on the port at 1 Gbps. 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47

DIS-200G Series Layer 2 Gigabit Industrial Smart Managed Switch Hardware Installation Guide
11
LED Indicators
All Switches
Below is an overview of the LED indicators present on all switch models in the DIS-200G series.
Figure 1-4 LED indicators for all DIS-200G Series switches
LED
Description
1
SYS
Solid green
The DIS-200G switch is on and accepting web connections.
Blinking green
A firmware update is in progress.
Solid amber
The DIS-200G switch is not ready for communication.
Blinking amber
The DIS-200G switch is booting up, or PoE has failed during system
operation (DIS-200G-12PS/PSW PoE models only).
2
ALM
Solid amber
The power supply to the DIS-200G has failed.
3
PWR 1
Solid green
Power source 1 is connected.
4
PWR 2
Solid green
Power source 2 is connected.
5
PWR 3
Solid green
Power source 3 is connected.
6
Ports 11 - 12
Solid green
Port is connected at 1 Gbps.
Blinking green
There is activity on the port at 1 Gbps.