Dell S4112F EMC S4112–ON Series Installation Guide October 2021 - Page 19

S4112–ON Series installation, Unpack, Unpack steps

Page 19 highlights

4 S4112-ON Series installation To install the S4112-ON Series (S4112F-ON and S4112T-ON) switch, complete the installation procedures in the order presented in this section. Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs). NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S4112-ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety precautions to prevent injury when installing this switch. NOTE: For more information, see the Open Networking Hardware Diagnostic Guide. Topics: • Unpack • Ground cable • Rack or cabinet installation • Half RU front-rack installation • Switch installation • Optics installation • Switch power-up • After switch installation • Switch replacement Unpack NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage. When unpacking the S4112-ON Series switch, make sure that the following items are included: ● One S4112F-ON or S4112T-ON switch ● One RJ-45 to DB-9 female cable ● AC power: two country- and region-specific AC power cables ● Two AC power cable clips ● DC power: two DC connectors ● AC ground lug kit ● DC ground lug kit-included in the accessories box ● S4112-ON Series Set-up Guide ● Safety and Regulatory Information ● Warranty and Support Information Unpack steps 1. Place the container on a clean, flat surface and cut all straps securing the container. 2. Open the container or remove the container top. 3. Carefully remove the switch from the container and place it on a secure and clean surface. 4. Remove all packing material. 5. Inspect the product and accessories for damage. S4112-ON Series installation 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

S4112–ON Series installation
To install the S4112-ON Series (S4112F-ON and S4112T-ON) switch, complete the installation procedures in the order presented
in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the S4112–ON Series switch and its components. As with all electrical devices of this type, take all the
necessary safety precautions to prevent injury when installing this switch.
NOTE:
For more information, see the
Open Networking Hardware Diagnostic Guide
.
Topics:
Unpack
Ground cable
Rack or cabinet installation
Half RU front-rack installation
Switch installation
Optics installation
Switch power-up
After switch installation
Switch replacement
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4112-ON Series switch, make sure that the following items are included:
One S4112F-ON or S4112T-ON switch
One RJ-45 to DB-9 female cable
AC power: two country- and region-specific AC power cables
Two AC power cable clips
DC power: two DC connectors
AC ground lug kit
DC ground lug kit—included in the accessories box
S4112–ON Series Set-up Guide
Safety and Regulatory Information
Warranty and Support Information
Unpack steps
1.
Place the container on a clean, flat surface and cut all straps securing the container.
2.
Open the container or remove the container top.
3.
Carefully remove the switch from the container and place it on a secure and clean surface.
4.
Remove all packing material.
5.
Inspect the product and accessories for damage.
4
S4112–ON Series installation
19