S5148F-Leaf1A, S5148F-Leaf1B, VxRail node 1, VxRail node 2, VxRail node 4

Page 25 highlights

S5148F-Leaf1A vlt-domain 127 backup destination 100.67.172.37 discovery-interface ethernet1/1/531/1/54 peer-routing end write memory S5148F-Leaf1B vlt-domain 127 backup destination 100.67.172.38 discovery-interface ethernet1/1/531/1/54 peer-routing end write memory 7.2 Dual switch without VLT This example uses a four-node VxRail cluster connected to a switch pair without VLT as shown below. S5148F-Leaf1A 1/1/20 19 18 17 S5148F-Leaf1B 1/1/17 18 19 20 LACP VxRail node 1 VxRail node 2 VxRail node 3 25GbE connections 100GbE LACP connections, ports 1/1/53-54 Note: The jump box/DNS server, not shown, is connected to port 1/1/9 on each switch. VxRail node 4 Rack 1 Four-node cluster connected to a switch pair without VLT In this topology, an LACP port channel is used to connect the two switches. The commands in the following sections are run to complete the configuration of both switches. The port numbers used in the configuration commands correspond to those shown in Figure 13. 25 Dell EMC Networking OS10 Enterprise Edition Switch Configuration Guide for VxRail 4.5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46

25
Dell EMC Networking OS10 Enterprise Edition Switch Configuration Guide for VxRail 4.5
S5148F-Leaf1A
S5148F-Leaf1B
vlt-domain 127
backup destination 100.67.172.37
discovery-interface ethernet1/1/53-
1/1/54
peer-routing
end
write memory
vlt-domain 127
backup destination 100.67.172.38
discovery-interface ethernet1/1/53-
1/1/54
peer-routing
end
write memory
7.2
Dual switch without VLT
This example uses a four-node VxRail cluster connected to a switch pair without VLT as shown below.
25GbE connections
100GbE LACP connections,
ports 1/1/53-54
Rack 1
S5148F-Leaf1A
S5148F-Leaf1B
LACP
1/1/20
19
18
17
1/1/17 18
19
20
VxRail node 1
VxRail node 2
VxRail node 3
VxRail node 4
Note:
The jump box/DNS server, not
shown, is connected to port 1/1/9 on
each switch.
Four-node cluster connected to a switch pair without VLT
In this topology, an LACP port channel is used to connect the two switches.
The commands in the following sections are run to complete the configuration of both switches. The port