Gateway E-9422R Gateway E-9422R Server User Guide - Page 55
Replacing the hot-swap backplane
![]() |
View all Gateway E-9422R manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 55 highlights
www.gateway.com Replacing the hot-swap backplane Caution The hot-swap backplane is not hot-swappable. Before removing or replacing the backplane, you must first turn off the server and all peripheral devices attached to the server, and remove the AC power cord(s) from the power supply or wall outlet. To replace the hot-swap backplane: 1 Follow the instructions in "Preventing static electricity discharge" on page 28. Make sure that you turn off the server, then unplug the power cord(s) and all other cables connected to the server. 2 Unlock the bezel (if necessary) and remove it by pulling it straight off the front of the server. 3 Follow the instructions in "Opening the server case" on page 29. 4 Remove all of the hot-swap drive carriers from the server and make note of which bay you remove each drive from. For instructions, see "Removing and installing a hard drive" on page 33. 5 Remove the system fans and fan board by following the instructions in "Replacing system fans" on page 42. 6 Disconnect all cables from the backplane. 7 Loosen the thumbscrew (1) on the backplane, then slide the backplane toward the right (2) (facing the back of the chassis) until it disengages the locking tabs and lift it out of the chassis. Caution Pressing or pulling on any components on the backplane could result in damage to the backplane. Caution Make sure you do not pinch, bind, or damage any cables as you install the backplane. 8 Holding the new backplane by the edges only, align it with the locking tabs on the chassis, then place it on the locking tabs and slide it to the left until it stops. 9 Tighten the thumbscrew to secure the backplane. 10 Reconnect all cables to the backplane. 11 Replace the fan board and system fans by following the instructions in "Replacing system fans" on page 42. 12 Follow the instructions in "Closing the server case" on page 30. 13 Reinstall the hot-swap drives back into the server. Make sure that you install the drives into the same bays you removed them from in Step 4. For instructions see "Removing and installing a hard drive" on page 33. 14 Replace the bezel by snapping it into place on the front of the server. 49
![](/manual_guide/products/gateway-computers-e9422r-gateway-e9422r-server-user-guide-02b940a/55.png)