HP 10642 HP 10000 G2 Series Rack Options Installation Guide - Page 102

Adjusting the kit, Tighten and lock both draw-latch straps to hold the upper duct in place 1.

Page 102 highlights

5. Using a T-30 Torx screwdriver, insert and tighten two M-12 bolts (from step 1) through the holes of the air duct assembly and into the two rear holes of the rack (3). Adjusting the kit After you have installed the air duct to the top of your rack: 1. Loosen both draw-latch straps (1). 2. Raise the upper duct until it reaches the ceiling opening, and the gasketing is pressed firmly against the ceiling (2). 3. Tighten and lock both draw-latch straps to hold the upper duct in place (1). 4. To lock the air duct in the raised position: a. Mark through the pre-drilled hole on the upper duct, so you know where the hole should be on the lower duct. Rack Air Duct kit 102

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129

Rack Air Duct kit
102
5.
Using a T-30 Torx screwdriver, insert and tighten two M-12 bolts (from step 1) through the holes of the
air duct assembly and into the two rear holes of the rack (3).
Adjusting the kit
After you have installed the air duct to the top of your rack:
1.
Loosen both draw-latch straps (1).
2.
Raise the upper duct until it reaches the ceiling opening, and the gasketing is pressed firmly against the
ceiling (2).
3.
Tighten and lock both draw-latch straps to hold the upper duct in place (1).
4.
To lock the air duct in the raised position:
a.
Mark through the pre-drilled hole on the upper duct, so you know where the hole should be on the
lower duct.