HP 10642 HP 10000 G2 Series Rack Options Installation Guide - Page 18
Installing foam rail gaskets between racks, HP Baying Rack Option Kit
![]() |
View all HP 10642 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
3. Insert the foam rail gasket into the space between the 19-in mounting rails and the vertical frame on both sides of the rack, with the closed cell side of the foam rail gasket facing the front of the rack. 4. Gently push the foam rail gasket into the space until it is flush with the vertical frame. Installing foam rail gaskets between racks CAUTION: The foam rail gasket must be installed into the rack before two or more racks can be bayed together. For additional information on baying racks, see the HP Baying Rack Option Kit. If installing the foam rail gasket between racks that have a baying kit installed, the baying bracket must be removed before the foam rail gasket can be inserted between the racks. 1. Position the racks side by side. 2. Cut the foam rail gasket to fit the size of your rack. Airflow Optimization kit 18
![](/manual_guide/products/hewlettpackard-10636-hp-10000-g2-series-rack-options-installation-guide-d108d9f/18.png)