HP Latex 3200 Site Preparation Guide - Page 10

System operation requirements

Page 10 highlights

HP Scitex CALDERA GRAND RIP V11 ● Server Administration (Server, Configure, Connection) ● GrandRIP+ (Main, Tool, Settings) ● Spooler ● Image Work Directory (Image positioning and scale setting on the page, and so on) Profile creation will not be covered. System operation requirements Electrical configuration NOTE: An electrician is required for the setup and configuration of the building electrical system used to power the printer and also for printer installation. Make sure that your electrician is appropriately certified according to local regulations and supplied with all the information regarding the electrical configuration. The HP Internal Print Server can be powered with a single-phase line that can be used with an Uninterruptible Power Supply (UPS). The UPS must be rated to meet the power requirements of the printer, and should be in accordance with the wiring standards of the country of installation. The printer requires the following electrical components to be supplied and installed by the customer, according to the Electrical Code requirements of the local jurisdiction of the country of installation. 1. Uninterruptible Power Supply (UPS) for single-phase control line (optional) NOTE: The HP Internal Print Server power can be obtained by making a connection inside the electrical cabinet. 2. Power Distribution Unit (PDU) including single-phase branch circuit breaker (optional) 3. Power Distribution Unit (PDU) including three-phase or two-phase branch circuit breaker depending on the power configuration 6 Chapter 2 Site preparation ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37

HP Scitex CALDERA GRAND RIP V11
Server Administration (Server, Configure, Connection)
GrandRIP+ (Main, Tool, Settings)
Spooler
Image Work Directory (Image positioning and scale setting on the page, and so on)
Profile creation will not be covered.
System operation requirements
Electrical configuration
NOTE:
An electrician is required for the setup and configuration of the building electrical system used to power
the printer and also for printer installation. Make sure that your electrician is appropriately certified according to
local regulations and supplied with all the information regarding the electrical configuration.
The HP Internal Print Server can be powered with a single-phase line that can be used with an Uninterruptible
Power Supply (UPS). The UPS must be rated to meet the power requirements of the printer, and should be in
accordance with the wiring standards of the country of installation.
The printer requires the following electrical components to be supplied and installed by the customer, according
to the Electrical Code requirements of the local jurisdiction of the country of installation.
1.
Uninterruptible Power Supply (UPS) for single-phase control line (optional)
NOTE:
The HP Internal Print Server power can be obtained by making a connection inside the electrical
cabinet.
2.
Power Distribution Unit (PDU) including single-phase branch circuit breaker (optional)
3.
Power Distribution Unit (PDU) including three-phase or two-phase branch circuit breaker depending on the
power configuration
6
Chapter 2
Site preparation
ENWW