Are Residual-Current Circuit Breakers RCCB, also known as Ground Fault Circuit

Page 35 highlights

Electrical installation Yes No Has the site been prepared for the chosen power option? Configuration 1 branch circuit breaker: 4 poles, 40/50 A Configuration 2 branch circuit breaker: 3 poles, 63/70 A Configuration 3 branch circuit breaker: ● Three-phase: 4 poles, 40/50 A ● Two-phase control: 2 poles, 15/16/20 A Configuration 4 branch circuit breaker: ● Three-phase: 3 poles, 63/70 A ● Two-phase control: 2 poles, 15/16/20 A Configuration 5 branch circuit breaker: 2 poles, 90 A Configuration 6 branch circuit breaker: ● Two-phase: 2 poles, 90 A ● Two-phase control: 2 poles, 15/16/20 A Configuration 7 Jumbo Rolls units configuration (not including the printer): ● Three.phase: 3 poles, 10 A Is the chosen power system within its nominal range? Configuration 1 Configuration 2 Configuration 3 Configuration 4 Configuration 5 Configuration 6 Jumbo input and output units configuration Is the grounding conductor properly installed, as shown in the site preparation guide? Have you booked the services of an electrician for the day of installation? Is the electrician aware of all requirements and specifications highlighted in this document? Is the Power Distribution Unit (PDU) correctly installed? Are Residual-Current Circuit Breakers (RCCB), also known as Ground Fault Circuit Interrupters (GFCI), required by local laws? if so, have they a sensitivity of 100 mA or higher? IMPORTANT: Residual-Current Circuit Breakers (RCCB) leak current must be higher than 100 mA. Electrical configuration Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed? Yes No ENWW Comments (Required) (Required) (Required) (Required) (Required) (Required) (Required) Comments 31

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37

Electrical installation
Yes
No
Comments
Has the site been prepared for the chosen power option?
Configuration 1 branch circuit breaker: 4 poles, 40/50 A
Configuration 2 branch circuit breaker: 3 poles, 63/70 A
Configuration 3 branch circuit breaker:
Three-phase: 4 poles, 40/50 A
Two-phase control: 2 poles, 15/16/20 A
Configuration 4 branch circuit breaker:
Three-phase: 3 poles, 63/70 A
Two-phase control: 2 poles, 15/16/20 A
Configuration 5 branch circuit breaker: 2 poles, 90 A
Configuration 6 branch circuit breaker:
Two-phase: 2 poles, 90 A
Two-phase control: 2 poles, 15/16/20 A
Configuration 7 Jumbo Rolls units configuration (not including the printer):
Three.phase: 3 poles, 10 A
(Required)
Is the chosen power system within its nominal range?
Configuration 1
Configuration 2
Configuration 3
Configuration 4
Configuration 5
Configuration 6
(Required)
Jumbo input and output units configuration
(Required)
Is the grounding conductor properly installed, as shown in the site preparation
guide?
(Required)
Have you booked the services of an electrician for the day of installation?
(Required)
Is the electrician aware of all requirements and specifications highlighted in this
document?
(Required)
Is the Power Distribution Unit (PDU) correctly installed?
(Required)
Are Residual-Current Circuit Breakers (RCCB), also known as Ground Fault Circuit
Interrupters (GFCI), required by local laws? if so, have they a sensitivity of 100 mA
or higher?
IMPORTANT:
Residual-Current Circuit Breakers (RCCB) leak current must be higher
than 100 mA.
Electrical configuration
Yes
No
Comments
Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed?