HP ProLiant WS460c HP ProLiant WS460c Gen8 Workstation Blade with WS460c Graph - Page 39

If the screws lack Nylok coating or are used, add Loctite 242 Threadlocker 3~5 threads from the tip.

Page 39 highlights

4. Align the plate to the board assembly, and then insert both tabs between the heat spreader and process control board. Do not move the plate. 5. Install the M2.5x6 mm flat head screws through the plate hole alignment to the baseplate. Do not apply any torque. Slightly tighten only by hand. If the screws lack Nylok coating or are used, add Loctite 242 Threadlocker 3~5 threads from the tip. 6. Install M2.5x6 mm wafer head screws (the same screws removed in step 1) through the heat spreader, plate tab, and process control board hole alignment to the baseplate, and then torque both screws to 4.0~4.5 in-lbf. Removal and replacement procedures 39

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107

Removal and replacement procedures
39
4.
Align the plate to the board assembly, and then insert both tabs between the heat spreader and process
control board. Do not move the plate.
5.
Install the M2.5x6 mm flat head screws through the plate hole alignment to the baseplate. Do not apply
any torque. Slightly tighten only by hand.
If the screws lack Nylok coating or are used, add Loctite 242 Threadlocker 3~5 threads from the tip.
6.
Install M2.5x6 mm wafer head screws (the same screws removed in step 1) through the heat spreader,
plate tab, and process control board hole alignment to the baseplate, and then torque both screws to
4.0~4.5 in-lbf.