IBM SAN16B-2 User Guide - Page 32

Installing, SAN16B-2, cabinet, required, Items, Installation, instructions

Page 32 highlights

Installing a SAN16B-2 into an EIA cabinet Attention: Refer to "Rack safety" on page xiii for danger and caution notices related to rack and cabinet installations. You can install the rack mount kit in either of two ways: v To allow the port side of the switch to slide out of the exhaust-air side of the cabinet. In this installation, the port side of the switch is flush with the edge of the cabinet. v To allow the non-port side of the switch to slide out the cool-air side of the cabinet. In this installation, the port side of the switch is set 3 in. (7.62 cm.) back from the edge of the cabinet, allowing a more gradual bend in the fiber optic cables. Time required Approximately 30 minutes Items required You need the following items to install the switch in a slide-rail rack: v Straight slot screwdriver v Rack space: 1.5 EIA units of rack space, 48.26 cm (19 in.) wide, and 60.96 cm (24 in.) deep v Two power cables that are provided with the switch v Two power outlets v Rack mount kit Attention: Use the exact screws specified in the procedure for use with the switch chassis. Using screws longer than 3/16 in. can damage the switch. The different types of screws are listed in Table 4 on page 11. Note: Make sure that you tighten all screws used in this procedure. Installation instructions To install the switch in a slide-rail rack that meets EIA standards, use the following procedure. Note: These procedures use parts that are included in the rack-mount kit. These parts are listed in Table 4 on page 11. The installation procedure cross-references the items in this table. Be sure to use the referenced parts when you perform each step. Before you start the rack-mount installation process, locate the rack-mount slides and the mounting bracket that are provided in the shipping container. Figure 3 on page 11 shows the rack assembly. The number keys, such as 1 , refer to the items listed in Table 4 on page 11. 10 SAN16B-2 Installation, Service, and User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93

Installing
a
SAN16B-2
into
an
EIA
cabinet
Attention:
Refer
to
“Rack
safety”
on
page
xiii
for
danger
and
caution
notices
related
to
rack
and
cabinet
installations.
You
can
install
the
rack
mount
kit
in
either
of
two
ways:
v
To
allow
the
port
side
of
the
switch
to
slide
out
of
the
exhaust-air
side
of
the
cabinet.
In
this
installation,
the
port
side
of
the
switch
is
flush
with
the
edge
of
the
cabinet.
v
To
allow
the
non-port
side
of
the
switch
to
slide
out
the
cool-air
side
of
the
cabinet.
In
this
installation,
the
port
side
of
the
switch
is
set
3
in.
(7.62
cm.)
back
from
the
edge
of
the
cabinet,
allowing
a
more
gradual
bend
in
the
fiber
optic
cables.
Time
required
Approximately
30
minutes
Items
required
You
need
the
following
items
to
install
the
switch
in
a
slide-rail
rack:
v
Straight
slot
screwdriver
v
Rack
space:
1.5
EIA
units
of
rack
space,
48.26
cm
(19
in.)
wide,
and
60.96
cm
(24
in.)
deep
v
Two
power
cables
that
are
provided
with
the
switch
v
Two
power
outlets
v
Rack
mount
kit
Attention:
Use
the
exact
screws
specified
in
the
procedure
for
use
with
the
switch
chassis.
Using
screws
longer
than
3/16
in.
can
damage
the
switch.
The
different
types
of
screws
are
listed
in
Table
4
on
page
11.
Note:
Make
sure
that
you
tighten
all
screws
used
in
this
procedure.
Installation
instructions
To
install
the
switch
in
a
slide-rail
rack
that
meets
EIA
standards,
use
the
following
procedure.
Note:
These
procedures
use
parts
that
are
included
in
the
rack-mount
kit.
These
parts
are
listed
in
Table
4
on
page
11.
The
installation
procedure
cross-references
the
items
in
this
table.
Be
sure
to
use
the
referenced
parts
when
you
perform
each
step.
Before
you
start
the
rack-mount
installation
process,
locate
the
rack-mount
slides
and
the
mounting
bracket
that
are
provided
in
the
shipping
container.
Figure
3
on
page
11
shows
the
rack
assembly.
The
number
keys,
such
as
±1²
,
refer
to
the
items
listed
in
Table
4
on
page
11.
10
SAN16B-2
Installation,
Service,
and
User’s
Guide