Intel SR1680MV Service Guide - Page 124
Push The Server To The End Of Racks, Secure The Server Ears To Racks - rail
UPC - 735858210447
View all Intel SR1680MV manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 124 highlights
6. Push the server to the end of racks to let the server snap the springs. Figure 69. Push The Server To The End Of Racks 7. Tighten the thumbscrews to secure the ears of the server to the racks. Figure 70. Secure The Server Ears To Racks Note: The system is not fixed to the rack or mounted to the rails. You must adequately support the system rack during installation and removal, or the risk of personal injury or damage to the equipment happens. 104 Intel® Server System SR1680MV Service Guide
104
Intel
®
Server System SR1680MV Service Guide
6.
Push the server to the end of racks to let the server snap the springs.
Figure 69. Push The Server To The End Of Racks
7.
Tighten the thumbscrews to secure the ears of the server to the racks.
Figure 70. Secure The Server Ears To Racks
Note:
The system is not fixed to the rack or mounted to the rails. You must adequately support
the system rack during installation and removal, or the risk of personal injury or damage
to the equipment happens.