Pfaff 1245 - 1246 Owner's Manual - Page 54

Thread, check, spring

Page 54 highlights

Adjustment 11.04.14 Thread check spring RTmheaeqteumriiaroelvm(eamepnpetrnotxo. f7thmremadspcrhinegckpaspthr)in. g 2 must be finished when the needle point enters the Due to technical reasons, the length of the thread-check spring path can vary a di little in either direction. 11 - 16 Fig. 11 .14 • Thread the machine, place test material under the presser foot and allow the presser foot to rest on the fabric using the presser foot lifter. • • • Loosen screw 1 Sew a few stitches by turning the handwheel and Continue to turn the handwheel (in its direction of then bring the rotation) until take-up lever to its TDC. the needle enters the • material. In this position, bring stop 3 to rest on thread check spring 2 and tighten screw 1. PFAF

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78

Adjustment
11.04.14
Thread
check
spring
Requirement
The
movement
of
thread
check
spring
2
must
be
finished
when
the
needle
point
enters
the
material
(approx.
7
mm
spring
path).
Due
to
technical
reasons,
the
length
of
the
thread-check
spring
path
can
vary
a
di
little
in
either
direction.
Thread
the
machine,
place
test
material
under
the
presser
foot
and
allow
the
presser
foot
to
rest
on
the
fabric
using
the
presser
foot
lifter.
Loosen
screw
1
Sew
a
few
stitches
by
turning
the
handwheel
and
then
bring
the
take-up
lever
to
its
TDC.
Continue
to
turn
the
handwheel
(in
its
direction
of
rotation)
until
the
needle
enters
the
material.
In
this
position,
bring
stop
3
to
rest
on
thread
check
spring
2
and
tighten
screw
1.
Fig.
11
.14
11
-
16
PFAF