Pfaff 1245 - 1246 Owner's Manual - Page 64

simultaneously

Page 64 highlights

Adjustment 11.05.07 Linkage rod Requirement When shaft 9 begins its sliding motion, lever 6 must simultaneously lift from stop 7. 11 - 26 Fig. 11 23 • Affix spherical head 1 to control lever 3 using screw 2. • • Loosen nuts 4 (right and left Bring the machine to needle handed thread). rise position by turning the handwheel and activate • engaging lever 5. Taking care to ensure that lever 6 is touching stop 7 (see arrow), turn linkage rod 8 in accordance with the requirement. • In this position tighten both nuts 4. • Carry' out a check in accordance with the requirement. PFAF

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78

Adjustment
11.05.07
Linkage
rod
Requirement
When
shaft
9
begins
its
sliding
motion,
lever
6
must
simultaneously
lift
from
stop
7.
Fig.
11
23
Affix
spherical
head
1
to
control
lever
3
using
screw
2.
Loosen
nuts
4
(right
and
left
handed
thread).
Bring
the
machine
to
needle
rise
position
by
turning
the
handwheel
and
activate
engaging
lever
5.
Taking
care
to
ensure
that
lever
6
is
touching
stop
7
(see
arrow),
turn
linkage
rod
8
in
accordance
with
the
requirement.
In
this
position
tighten
both
nuts
4.
Carry’
out
a
check
in
accordance
with
the
requirement.
11
-
26
PFAF