Pfaff 1245 - 1246 Owner's Manual - Page 64
simultaneously
View all Pfaff 1245 - 1246 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 64 highlights
Adjustment 11.05.07 Linkage rod Requirement When shaft 9 begins its sliding motion, lever 6 must simultaneously lift from stop 7. 11 - 26 Fig. 11 23 • Affix spherical head 1 to control lever 3 using screw 2. • • Loosen nuts 4 (right and left Bring the machine to needle handed thread). rise position by turning the handwheel and activate • engaging lever 5. Taking care to ensure that lever 6 is touching stop 7 (see arrow), turn linkage rod 8 in accordance with the requirement. • In this position tighten both nuts 4. • Carry' out a check in accordance with the requirement. PFAF
Adjustment
11.05.07
Linkage
rod
Requirement
When
shaft
9
begins
its
sliding
motion,
lever
6
must
simultaneously
lift
from
stop
7.
Fig.
11
23
•
Affix
spherical
head
1
to
control
lever
3
using
screw
2.
•
Loosen
nuts
4
(right
and
left
handed
thread).
•
Bring
the
machine
to
needle
rise
position
by
turning
the
handwheel
and
activate
engaging
lever
5.
•
Taking
care
to
ensure
that
lever
6
is
touching
stop
7
(see
arrow),
turn
linkage
rod
8
in
accordance
with
the
requirement.
•
In
this
position
tighten
both
nuts
4.
•
Carry’
out
a
check
in
accordance
with
the
requirement.
11
-
26
PFAF