Toshiba A20-S259 Maintenance Manual - Page 429
Removing the control PCB, top case and cover assembly
View all Toshiba A20-S259 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 429 highlights
4 Replacement Procedures 4.30 Fluorescent Lamp Removing the control PCB, top case and cover assembly 6. Remove the FPC cable (1) used for the control PCB connecting. CAUTION: Pressure or stress should not be given on the FPC cable. 7. Remove the control PCB (2). CAUTION: At first, move the control PCB to the left 8. Remove the top case (3) CAUTION: Pressure or stress should not be given on the top case and gate TCP 9. Remove the screw and cover assembly (4). CAUTION: Pressure or stress should not be given on the source TCP Maximum value of torque with screw should be below 2.0kgf.cm Figure 4-169 Removing the control PCB, top case and cover assembly 4-210 Satellite A20 Maintenance Manual (960-444)
4
Replacement Procedures
4.30
Fluorescent Lamp
4-210
Satellite A20 Maintenance Manual (960-444)
Removing the control PCB, top case and cover assembly
6.
Remove the FPC cable (1) used for the control PCB connecting.
CAUTION
:
Pressure or stress should not be given on the FPC cable.
7.
Remove the control PCB (2).
CAUTION
:
At first, move the control PCB to the left
8.
Remove the top case (3)
CAUTION
:
Pressure or stress should not be given on the top case and gate TCP
9.
Remove the screw and cover assembly (4).
CAUTION
:
Pressure or stress should not be given on the source TCP
Maximum value of torque with screw should be below 2.0kgf.cm
Figure 4-169
Removing the control PCB, top case and cover assembly